For Rent - Factory For Rent
Factory Rent HD01
A brand new factory for rent in Hai Duong Province, Viet Nam. Located right inside a good industrial park that takes us about 1h50 minutes to downtown of Ha Noi Capital, Viet Nam, close to sea port systems and easy to access to provinces in the North of Viet Nam..
Factory Rent HD01 Key distances:
- Noi Bai Airport: 71 km
- Ha Noi CBD: 60 km
- Cat Bi Airport, Hai Phong: 54 km
- Hai Phong Port: 50 km
Specifications & Featured:
INSIDE AREA | |
Foundation | Reinforced concrete foundation with concrete pile. |
Floor loading | 1st floor: 3,000 kg/m2
2nd floor: 1,200 kg/m2 |
Cargo lift for 2-storey standard factory | 02 cargo lift structure, cover and pit hole
Cargo lift equipment are installed as required by Lessee (lift’s capacity) and cost of equipment shall be paid by Lessee |
Internal staircase | 02 staircases steel structure |
2nd Floor | Second floor: Reinforced concrete floor (Decking floor) with polished surface |
Roller shutter door | Roller shutter door Ausdoor, automatic and manual control, 04 sets on 1st floor, 02 sets on 2nd floor. Total area for each set approx… 12 – 15 m2 |
Windows surrounding factory | Plastic frame window with steel core, white glass 6.38mm |
Roofing | SEAM galvanized plate (non-screw corrugated iron), galvanized aluminum 0.45mm thickness, Cat Tuong heat insulation ceiling sheet layer with double-sided coated aluminum |
Main structure (columns, trusses, beams) | The main structure is welded steel with fire-proof paint to assure Vietnam fire protection standards |
Outter wall | Outter brick wall with 110mm width and 0.9m height
Upper part installed corrugated iron 0.4mm up to the roof |
Water leakage | In case of any water leakage from the factory roof (not relating to the reasons caused by the Lessee), the owner guarantees to properly fix the problems within 24 hours, the reparation fee will be paid by the owner.
The owner is committed to providing a 1-year limited warranty (from the date of handover) to the Lessee. From the 2nd year onwards, the party to bear the repairing costs is determined according to the working record from the two technical parties when a water leakage occurs. |
Toilet area | Provide toilet area of 40m2 on 1st floor (Brick wall 110mm width and 3.4m height, door 900×2300, Compact partition) |
OUTSIDE AREA | |
Drainage system | The owner invests regarding to IP’s plan, the owner bears the costs. |
Sewerage system & Wastewater Treatment station | Sewerage system: The centralized wastewater treatment station of the industrial zone and the sewage collection pipeline system are invested by the owner (the owner bears the cost). If the Lessee agrees to use the owner’s wastewater treatment service (at the expense of the Lessee), the owner will assure all wastewater discharged into the environment complies with Vietnam Laws and the owner is willing to provide required certificate to the Lessee.
The owner provides the sewage connection point for the Lessee to connect to the owner’s pipeline system, the location of the connection point is no more than 30m from the factory walls. |
Road and internal surrounding area | The main area trucks operate regularly has the load capacity of H30 |
Fence | The owner to provide and install the removable steel fence surrounding the land plot of the Lessee |
Parking area | Adjust according to the allowed construction plan |
Fire-fighting pump station and outdoor fire-fighting water supply | In the Industrial Park, there is a fire fighting pump station, underground tank of 6000m3 containing fire-fighting water used for the whole Industrial Park. The owner supplies fire-fighting water to the enclosure walls of the factory. |
POWER & WATER SUPPLY | |
22KV power supply | 22KV power supply in the owner’s Industrial Parks ensures Lessee’s using capacity
The closest distance from the owner’s 22KV power connection point to the enclosure wall of the factory is on about 100m. The construction and installation of the electrical system and use of electricity are performed under contracts based on compliance with Vietnamese Law. |
2KV Electricity shutdown | In case of any 22KV electricity system shutdown (not relating to electricity supply suspension by Hai Duong electric company or force majeure events or other issue of Vietnam’s electricity agencies), APC guarantees to properly fix problems within 24 hours. Lessee need to follow all contracted term for electricity usage, any breach of electricity usage regulation might result in system shut down. |
Domestic and production water supple | The owner shall provide sufficient production and domestic water supply to the point of water supply at surrounding fence of the factory. The water costs shall be paid by Lessee. |
Available sizes for rent: 5,747sq.m, 5,754sq.m, 6,804sq.m, 6,513sq.m
Rental price: Please kindly contact our agent for updating rental price.
Noted: Information about the property and its availability are subject to change without notice.
Please contact to our agent for any further information of Factory Rent HD01.
Terms of Service: We, PDIndustrials Co., Ltd will take a-half (½) month rental (For first month only), plus VAT from the tenant for successful recommendation.
The commission will be paid by the tenant to PDIndustrials Co., Ltd, when tenant signs the lease contract or pays security deposit, whichever comes earlier.