For Rent - Factory For Rent
Factory Rent DN47
A brand new factory for rent in Dong Nai, Vietnam. Located right inside a good industrial park that takes us about 30km to downtown of Ho Chi Minh City by the Ho Chi Minh City – Long Thanh- Dau Giay express. Easy to access to Binh Duong, Vung Tau, Long An, Ho Chi Minh City.
Geographic location:
(1) Cities:
– Ho Chi Minh city:
- 35km through Cat Lat ferry.
- 40km through Ha Noi and No. 51 highway.
- 15km through HCMC- Long Thanh- Dau Giay expressway.
– Bien Hoa city: 05 km
(2) Ports:
– 27 km to Phu My Deep Water Port
– 50 km to Vung Tau Sea Por
– 25 km to Saigon New port, Cat Lai
(3) Airports:
– 50 km to Tan Son Nhat Airport
– 10 km to Long Thanh Int’l Airport (of which the first phase will go into operation by the end of 2025)
Factory Rent DN47 Specifications:
Total land area: 3.96ha including 7 factories. Construction percentage: 55.6%
SPECIFICATION OF THE FACTORY NO., 1, 2, 4, 5, 6 & 7 |
|||||
No |
Description |
Dimensions (m) |
Construction area (sq.m) |
Floor area (sq.m) |
Notes |
1 |
Factory |
36 x 70 |
2,520 |
2,692.8 |
|
2 |
Office space |
|
340 |
340 |
GF & 1 level |
3 |
Parking shed |
25 x 5 |
125 |
125 |
|
4 |
Power station |
3 x 4 |
12 |
12 |
|
5 |
Toilet block |
10,4 x 3,4 |
36,4 |
36,4 |
|
6 |
Guardhouse |
2 x 3 |
6 |
6 |
|
7 |
Green area |
|
933.20 |
|
|
8 |
Internal roads |
|
983.28 |
|
|
SPECIFICATION OF THE FACTORY NO., 3 |
|||||
No |
Description |
Dimensions (m) |
Construction area (sq.m) |
Floor area (sq.m) |
Notes |
1 |
Factory |
72 x 72 |
5,184 |
5,184 |
|
2 |
Office space |
Will be built as tenant’s required |
|||
3 |
Parking shed |
50 x 10 |
500 |
500 |
|
4 |
Power station |
6 x 8 |
48 |
48 |
|
5 |
Toilet block |
20,8 x 6,8 |
141,4 |
141,4 |
|
6 |
Guardhouse |
4 x 6 |
24 |
24 |
|
7 |
Green area |
|
1,866.4 |
|
|
8 |
Internal roads |
|
1,966 |
|
|
Factory Rent DN47 Featured information:
Type |
Products manufacturing / Warehouse / Industry |
|
Construction starting |
End of 2020 |
|
Ready in possession |
End of Q1/2021 |
|
Property Highlights |
Located in the largest industrial area of Dong Nai Province, near to the three most crowded areas of Dong Nai Province (Trang Bom, Bien Hoa, Long Thanh) Convenient access to major roads: National Road No.1, No.51, Vo Nguyen Giap Road (Bien Hoa City Bypass), Ho Chi Minh-Long Thanh-Dau Giay Highway… High priority calling for projects which specialize in industries of high technology, using modern and environment-friendly technologies. |
|
FACTORY INSIDE |
||
Lighting system |
Incandescent lamps |
|
Electrical system |
Electrical distribution cabinet |
|
Fire protection system |
Smoke detector, emergency switch, fire alarm, fire cabinet |
|
Lightning-rod |
Fully installed |
|
Electric capacity |
Supply from the National gridline from the Song May sub-station through 110KV transmission line and 110/22kV transformer station |
|
Apex clearance height |
13,37 m |
|
Ridge height |
9,25 m |
|
Roof |
Kliplok insulated stainless sheet metal |
|
Insulation |
Polynum space |
|
Structure construction |
Modern steel portal frame structure |
|
Wall |
200 – mm brick (trowel, emulsion paint), colourful stainless steel partition |
|
Floor |
Flat steel reinforced concrete floor with surface hardening additive, loading capacity of 3 tons/sq.m |
|
Access loading door |
Chain gear and electrically operated ground level steel rolling shutter door Quantity: 02 units Dimension:7.2m x4.5 m |
|
Auxiliary access door |
Chain gear and electrically operated ground level steel rolling shutter door Quantity: 02 units Dimension:3.0m x 3.0 m |
|
Side access door |
Chain gear and electrically operated ground level steel rolling shutter door Quantity: 02 units Dimension: 5.0m x 4.5 m |
|
Emergency exit door |
Glazed and iron framed door Dimension:1.0m x 2.2m |
|
Windows |
Glazed and aluminum frame with secure glazing bars Dimension:1.6m x 1.6m |
|
FACTORY OUTSIDE |
||
SECURITY GUARD HUT |
||
Area |
06m2 (3m x 2m) & 24m2 (4m x 6m) |
|
Air conditioning system |
Ventilation fan |
|
Lighting system |
Fluorescent lamps |
|
Electrical system |
Distribution cabinet, switches and sockets |
|
Telephone system |
LAN (local area network) and sockets |
|
Structure construction |
Reinforced concrete (R/C) |
|
Wall |
200 – mm brick (trowel, emulsion paint) |
|
Ceiling |
Reinforced concrete, trowel, emulsion paint |
|
Floor |
Reinforced concrete (R/C), ceramic tiles |
|
Doors/windows |
Glazed and aluminum frame |
|
Sanitary system |
Fully installed |
|
SECURITY GATE |
||
Quantity |
01 unit for each |
|
Dimension |
1.8 m x 12.0 m |
|
Material |
stainless steel folding gate with electrically operated |
|
VEHICLE SHED |
||
Height |
2.2 m |
|
Lighting system |
Fluorescent lamps |
|
INTERNAL AISLES |
||
Maximum width |
5 m |
|
Load bearing capacity |
2.5 kg/cm2 (~ 25 tons/m2) |
|
PUMP STATION FOR FIRE PROTECTION |
||
Underground tank |
Reinforced concrete, area 600cm3 (35×5) |
|
Water pump station |
Fully installed |
|
Diesel pump |
Fully installed |
|
Electrical pump |
Fully installed |
|
Small pump |
Fully installed |
|
Electrical system |
Distribution cabinet |
|
OTHER FACILITIES |
||
Lighting system |
Surrounding the workshop area |
|
Fire protection system |
Fire cabinet, water supply poles |
|
Storm drainage system |
Connected to common storm drainage system IP |
|
Wastewater drainage system |
Connected to common wastewater drainage system in IP |
|
Flagpole |
Stainless steel pole |
|
Fence |
2m in height, open fence or close fence depend on the location of land |
|
Company name board |
Natural granite tilted |
|
Green area |
Surrounding the workshop area |
|
Outside restroom |
Separate male and female restrooms with fully installed |
|
EXTRA BENEFITS |
||
Tax exemption |
Tax exemption for first 2 years, 50% tax reduction for the next 4 years. Hi-tech sector has a preferential tax rate of 10% for 15 years. Priority future purchase rights. |
Factory Rent DN47 Rental price: Negotiate upon site visit.
Note: Information about the property and its availability are subject to change without notice.
Please contact to our agent for any available of Factory Rent DN47.
Terms of Service: We, PDIndustrials Co., Ltd will take a-half (½) month rental (For first month only), plus VAT from the tenant for successful recommendation. The commission will be paid by the tenant to PDIndustrials Co., Ltd, when tenant signs the lease contract or pays security deposit, whichever comes earlier.